  • Securing the footings and making sure they are level.
  • Main profile erected and established.
  • Close-up of profile's footing.
  • Outer floor joist support connected.
  • Close-up of the upper profile's connection.
  • Close-up of the floor joist connection.
  • Another look at the floor joist and its interlocking patented system for extra support.
  • Interior floor supports are installed.
  • Roof beams connected
  • Another angle of the recently added roof pitch.
  • With roof shield installed, the roof is put in place.
  • The roof in the process of installation.
  • With the roof half way installed, the Sanctuary starts to take shape.
  • Another angle of the almost completed construction.